13
R-1210
R-1211
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
(17) Reconnect the power supply cord after the outer case is installed. Run the oven and check all
functions.
(18) Carry out “Water load cooking test” again and ensure that the oven works properly.
R1, R2 :
22
Ω
±
1% 1/2W
R3 : 4.3k
Ω
±
5% 1/4W
R4 :
1M
Ω
±
5% 1/4W
Sensor Dummy Resistor Circuit
Plunger
NC
NO
COM
COM
NO
NC
R3
R4
R1
R2
1
2
3
F-1
F-2
F-3
To connector (F)
on Control Unit.
CONNECTOR