21HF2-SS
3 – 2
1. ADJUSTMENT ITEM
***Below are the adjustment items that should be done, PLS FOLLOW THE PROCEDURE. Otherwise some adjustment items will not be accurate.
NO***
ADJUSTMENT ITEM
REVISION
1
BUS SET UP
2
OPTION SET UP
3
H-VCO
4
VIF-VCO
5
S-TRAP fo
6
RF-AGC
7
PURITY ADJ
8
CONVERGENCE ADJ
9
FOCUS ADJ
10
V-SHIFT (50 Hz)
11
H-SHIFT (50 Hz)
12
V-SIZE (50 Hz)
13
SCREEN
14
WHITE BALANCE
15
SUB-BRIGHTNESS
16
SUB-CONTRAST
17
SUB-TINT
18
SUB-COLOUR
19
SECAM-OFFSET
20
BEAM CURRENT CHECK
21
BEAM PROTECTOR CHECK
22
HV PROTECTOR CHECK
23
OTHER PROTECTOR CHECK
24
AV OUT CHECK
25
AV IN CHECK
26
CONTRAST CONTROL CHECK
27
COLOUR CONTROL CHECK
28
BRIGHTNESS CONTROL CHECK
29
TINT CONTROL CHECK
30
SHARPNESS CONTROL CHECK
31
CH DISPLAY COLOUR CHECK
32
NORMAL DISPLAY CHECK
33
WHITE TEMP CONTROL CHECK
34
COLOUR SYSTEM CHECK
35
SOUND SYSTEM CHECK
36
NOISE MUTE CHECK
37
OSD LANGUAGE QUANTITY CHECK
38
HEAD PHONE CHECK
39
SHOCK TEST CHECKING
40
ROM-CORRECTION CHECKING
Содержание 21HF2-SS
Страница 52: ...21HF2 SS 9 2 2 BLOCK DIAGRAM MAIN UNIT A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 ...
Страница 53: ...21HF2 SS 9 3 11 12 13 14 15 16 17 18 19 10 ...
Страница 56: ...21HF2 SS 11 2 2 SCHEMATIC DIAGRAM MAIN UNIT A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 ...
Страница 57: ...21HF2 SS 11 3 11 12 13 14 15 16 17 18 19 10 ...
Страница 59: ...21HF2 SS 12 2 11 12 13 14 15 16 17 18 19 10 ...
Страница 60: ...21HF2 SS 12 3 2 MAIN UNIT Wiring Side A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 ...
Страница 61: ...21HF2 SS 12 4 11 12 13 14 15 16 17 18 19 10 ...