23-1
HIGH VOLTAGE
-
STEP RANGE
-
-
AFTER ALL ADJUSTMENT FINISHED.
US 6 CH LION HEAD (MONOSCOPE PATTERN)
AC 230V, RF INPUT
CRT ANODE VOLTAGE
SET THE USER CONTROL TO SHIPMENT SETTING POSITION. PUSH
ON Y-MUTE BY R/C CONFIRM THE VOLTAGE OF CRT ANODE BY HIGH
VOLTAGE METER AND MAKE SURE THE READING IS AS BELOW.
[CAUTION POINT]
USE ELECTROSTATIC HI-VOLTAGE METER AND FOLLOW THE UL/
DHHS STANDARD TO MAKE CORRECTION AND CONTROL.
SYMBOL
REVISED CONTENT,
ADJUSTMENT
ITEM
ADJUSTMENT
POSITION
CONTROL
PRE-ADJUST
REQUIREMENT
CONTENT
INPUT
CONDITION
OUTPUTW
ADJUSTMENT
PROCEDURE
HISTORY
OF REVISION
HIGH VOLTAGE
BELOW
25.5
kV
14V-R70M
Содержание 14V-R70M
Страница 24: ...24 WAVEFORMS 14V R70M ...
Страница 25: ...25 6 5 4 3 2 1 A B C D E F G H CHASSIS LAYOUT 14V R70M DUNTKD373WE PR701 ...
Страница 26: ...26 6 5 4 3 2 1 A B C D E F G H CRT BLOCK DIA GRAM 14V R70M ...
Страница 28: ...28 14V R70M 10 11 12 13 14 15 16 17 18 19 FILT HLF V HOLD SAV L VOL FR P MONO POW ...
Страница 30: ...220 270 R609 27 1 2 W C720 1u 50V 22 0 0022 ...
Страница 31: ...32 6 5 4 3 2 1 A B C D E F G H SCHEMATIC DIAGRAM CRT Unit 14V R70M ...
Страница 34: ...35 6 5 4 3 2 1 A B C D E F G H 14V R70M PWB B CRT Unit Wiring Side ...
Страница 43: ...I NAKAMURA M GABIT A UGALDE A CALING 1 Noted Approved Checked Prepared Issue No Date Received by ...