![SGS Trio OEK-400 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/sgs/trio-oek-400/trio-oek-400_user-and-maintenance-manual_1251342008.webp)
INSTALLATION DIAGRAM AND INSTALLATION OF THE DEVICE
8/12
2
1
2
8
1
4
3
5
6
7
6
1. Resistance
2. Turning rate setting button
3. Slices outcome tray
4. Conveyor
5. Slice feeding panel
6. Outcome direction setter
7. Power supply cable
8. Commutator
- Workbench on which the device stands should be adjustable and leveled with balance.
- Power connections should be checked by an eligible electrician and the device should
be connected to a fuse at 400 mm. high above the ground.
- Power installation to be used for the device should be grounded by connecting it to a
grounding bar at the nearest panel. 16 A timer relay should be used on power board.
CAUTION !
NEVER OPERATE YOUR DEVICE WITHOUT GROUND CONNECTION.
COMMAND BOARD
A. Commutator
B. Rate setting button
A
B