To mount the rail mounting channels:
1. If using full auxiliary rails, measure the distance between the floor and the bottom
of the housing.
OR
If using stub rails between the bottom of the housing and the top of the elevator
frame head, measure the distance between the two.
2. Use the measurement to cut the mounting channels.
3. Drill holes on each channel for wall fasteners, evenly spacing the holes
approximately 16 inches apart:
TIP: Drill holes within 1 inch of each end of the rail.
4. Align the center of a mounting channel with the centerline for the right channel,
which is marked inside the housing (the INSIDE line of the pair of vertical lines).
5. Level the mounting channel vertically.
6. Mark and drill holes into the wall (lining them up with the holes that you drilled
through the mounting channel).
7. Drive fasteners through the mounting channel into the drilled holes.
8. Repeat steps 4-7 for the left channel.
centerline for rail
mounting channel
14