Verify curtain assembly clearance
General contractor provides clearance on landing side of elevator:
°
extending from the bottom of the housing to the floor along full curtain
assembly width
°
centered over the hoistway frame
°
unobstructed, wall plumb, with no distortions
°
free of all obstructions and projections that exceed the housing return within the
full width extending from the bottom of housing to the floor, including elevator
position indicators, signs, and hall call stations
°
includes clearance for door swing
°
with 2 inch wide backing for auxiliary rail backers extending the full height,
behind new wall construction or over existing wall construction
Remove Housing Door
Installation will be easier if you remove the housing door before you begin.
To remove the housing door:
1. Remove screws holding door rod on one side of the housing door.
2. Pull rod out enough to remove the door.
8