![SEW DRC.-...-DAC Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/sew/drc-dac/drc-dac_operating-instructions-manual_1250005043.webp)
Operating Instructions – Electronic Motor DRC.-..-DAC
43
5
Installation instructions
Electrical Installation
5.2.9
Notes on PE connection
Earth-leakage currents
≥
3.5 mA may occur during normal operation. To meet the
requirements of EN 61800-5-1, observe the following notes:
• The protective earth (PE) connection must meet the requirements for plants with high
earth-leakage currents.
• This usually means
– installing a PE connection cable with a minimum cross section of 10 mm
2
– or installing a second PE connection cable in parallel with the original PE
connection.
WARNING
Electric shock due to incorrect connection of PE.
Severe or fatal injuries.
• The permitted tightening torque for the screw is 2.0 – 2.4 Nm (18 – 21 lb.in).
• Observe the following notes regarding PE connection.
Prohibited assembly
Recommendation:
Assembly with forked cable lug
Permitted for all cross sections
Assembly with solid connecting wire
Permitted for cross sections up to
max. 2.5 mm
2
2377711243
2377688075
2377672587
[1] Forked cable lug suitable for M5 PE screws
[1]
M5
2.5 mm²
M5
Содержание DRC.-...-DAC
Страница 2: ...SEW EURODRIVE Driving the world...
Страница 249: ......
Страница 250: ......
Страница 251: ......