4
Parts and Tools Required (not included)
The following tools may be required depending on your particular installation. They are not included.
P5080T
Installation Instructions
Visit the Premier Mounts website at http://www.premiermounts.com
Page 3
Parts List
Installation Tools
The following tools may be required depending upon your particular installation. They are not included.
Pencil
Level
¼˝ Drill Bit for
Wood Stud
Electronic Stud Finder
Socket Wrench
Phillips Tip Screwdriver
Tape Measure
Hand Held Drill
Hammer**
3
/
8
˝
Concrete Drill Bit*
Protective Eyewear
* Optional tools for concrete installations.
½˝ Socket
M10 Socket*
2
1
5/16
˝ x 3˝ Lag Bolts
(Qty 6)
Thread Depth Indicator
(Qty 1)
Universal Spacers
Finned Anchors
(Qty 6)
(Qty 24)
5/16
˝
Flat Washers
(Qty 6)
Pro Mounting Hardware
Universal Washers
(Qty 6)
Security Barrel
(Qty 1)
Wall Plate
(Qty 1)
Universal T
ilt Brackets
(Qty 2)
M6 x 60mm Screws
(Qty 2)
1/2”
1/2”
1/2”
1/2”
Level
Stud Sensor
(edge-to-edge stud
finder is recommended)
Tape Measure
7/32” Drill Bit
7/16” Masonry Drill Bit
Socket Wrench
½” Socket
Hammer
½” Combination
Wrench
Pencil
Power Drill
Philips #2
Screwdriver
(6mm Allen Wrench
for use with 86”
Ultra Bright TV size)
For Wood Stud Installation
For Concrete, Brick and Stone Installation
1/2”
1/2”
1/2”
1/2”
1/2”
1/2”