
Wiring Up
Mains:
This is pre cabled and fitted with AS/NZ mains plug ready for connection
to internal GPO. Ensure that the connection to the mains supply is in accordance
with the national wiring rules, and that the earth connection is installed.
Load, Battery and External DC Input Connections:
Connectors are 0.8 x
6.3mm QC tabs. Use mating QC connector suitable for cable size. Connector pin
out is shown below.
10
F4
F5
F6
F7
F8
FBATT
L1+
L2+
L3+
L4+
L5+
VBATT+
Fuse
Panel
+ve
terminals
+
_
L-
L-
L-
L-
L-
VBATT-
V Ext+
-ve
terminals
Plus
Vext+
input
F Ext
+
_
To External
Voltage
To L-
CAUTION
V Ext+ must be supplied
from a Fused (F Ext),
external
voltage.
Load 4
Load 5
Load 6
Load 7
Load 8
F3
L1+
L-
F2
L1+
L-
F1
L1+
L-
Load 1
Load 2
Load 3
F1
L-
Load 1
Battery Isolate
On / off
Input