
25
STEP 2: Run Sermatec App(local connection mode), connect to the inverter, and check if there is some
abnormal warning.
STEP 3: If there is no warning, setting
Grid standard
(must),
Battery type
(must)
,
then click “Proceed.”
STEP 4: Setting
Working mode
(Must) in your application.
STEP 5: Setting other parameters (Optional) such as: Price setting, Period setting and etc.
STEP 6: Click the “startup” button to power on the inverter.
STEP 7: Check and observe running data and status on the parameters page for several minutes.
STEP 8: Click the “Warning” button to check the system fault info if any fault occurred.
Power OFF steps:
STEP 1: Click the “Shutdown” button in the “Setting” menu to power off the inverter.
STEP 2: Open the switches if needed.
Содержание SMT-5K-TL-LV
Страница 6: ......