![Seres OL SOL-96.110.071 Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/seres-ol/sol-96-110-071/sol-96-110-071_operators-manual_1246339040.webp)
SOL-96.110.071 / 180122
TOPAZ Aluminum
Maintenance
38
5
Connect the new tube to the right side fitting and roll the tube
around the rotor while turning it.
6
Connect the other tube end to the left side fitting.
7
Install the front cover on the pump.
8
Insert the reagent tubes all the way to the bottom of the
).
9
Priming the Reagent Tubes, p. 24
).