3.
Installation
3.1. Before Installation
Unpacking
Carefully unpack the analyzer and check it for visible damage.
On-site
requirements
Verify the electrical and hydraulic connections available at the
installation site against the requirements in
3.2. Mounting the Wall Cabinet
Mounting
requirements
Mount the instrument in vertical position. The display should be at
eye level to simplify operation and maintenance.
.
Reagent
bottles
Reagent bottles must be stored outside the analyzer. Provide a
suitable storage area near the analyzer.
As an option, a reagent shelf is available that can be installed directly
below the analyzer.
3.3. Hydraulic Connections
For hydraulic connections, refer to the separate hydraulic scheme.