
嗡
嗡
.&$)"/*$"-*/45"--"5*0/
INSTALLATION GUIDE FOR SERAPHIM
DUAL GLASS PHOTOVOLTAIC MODULE
INSTALLATION GUIDE FOR SERAPHIM
DUAL GLASS PHOTOVOLTAIC MODULE
:G
ble 3
Type 1
+ 5400
- 2400
+ 5400
- 2400
+ 5400
- 2400
+ 5400
- 2400
Type 2
:_VK
Type 4
.
ʈSS
ʈSS
.
ʈSS
ʈSS
S
E
R
IA
L
N
U
M
B
E
R
L
L/8
L/4
L/8
L/4
L
L/8
L/4
L/8
L/4
S
E
R
IA
L
N
U
M
B
E
R
L/8
L/4
L/8
L/4
L
S
E
R
IA
L
N
U
M
B
E
R
L/8
L/4
L
L/8
L/4
:
ype
Loads
6G
Clamp Length
Installation Drawing
10
11
Figure 7 M8 Screw installation
In order to ensure that the modules can withstand a downward force of up to
24
00 Pa (
244
kg/m2), the modules shall be fixed on the bracket with the long
side of the module, using a minimum of four screws. Please make sure to use at
least of two purlins behind the modules to support the modules.
The selection and installation of the screws shall obey the requirement accord
ing to table
4
. Otherwise the module may not satisfy the mechanical load and
have the risk of broken.
The dual glass module with frame is also designed for screw installation . It
needs the screws, bolts, nuts and washers to fix on the bracket(as shown in fig7).
Sufficient torque should be applied to the bolts to ensure stable reinforcement.
.
M
*
N
0
2
~
6
1
s
i
w
e
r
c
s
8
M
r
o
f
e
u
l
a
v
e
u
q
r
o
t
e
c
n
e
r
e
f
e
r
e
h
T
Dual-glass module
Frame
M 8
Hex bolt
Flat washer
Spring washer
Hex nut
Bracket
4$3&8*/45"--"5*0/