Seraphim SRP 6MA-BG Series Скачать руководство пользователя страница 5

9

8

.&$)"/*$"-*/45"--"5*0/

INSTALLATION GUIDE FOR SERAPHIM 

DUAL GLASS PHOTOVOLTAIC MODULE

INSTALLATION GUIDE FOR SERAPHIM 

DUAL GLASS PHOTOVOLTAIC MODULE

:G

ble 2

:

ype

Loads

6G

Clamp Length

Installation Drawing

:_VK

≥SS

:_VK

:_VK

:_VK

.

SE
RI

A

L N
UM

BE
R

250

350

250

350

L/2

L

SE
RI
AL NUM

BE
R

SE
RI
AL NUM

BE
R

350

450

350

450

SERIAL

 NUMBER

SERIAL

 NUMBER

L

250

350

250

350

L/2

SERIAL

 NU

M

BER

350

450

350

450

≥SS

≥SS

≥SS

$-".1*/45"--"5*0/

Figure 3 Double-side clamp

Figure 4 Single-side clamp

Figure 5 Double-side clamp installation

Figure 6 Single-side clamp installation

In order to ensure that the modules can withstand a downward force of up to 
5400 Pa (550 kg/m2), the modules shall be fixed on the bracket with the long 

side of the module, using a minimum of four clamps. Please make sure to use at 
least of two purlins behind the modules to support the modules.

The selection and installation of the clamps shall obey the requirement accord

ing to table 3. Otherwise the module may not satisfy the mechanical load and 
have the risk of broken.

The dual glass module with frame is designed for clamp  installation . It needs 
the clamps, bolts, nuts and washers to fix on the bracket(as shown in figure  5 and 
figure 6). Sufficient torque should be applied to the bolts to ensure stable reinfo-

.

M

*

N

0

2

~

6

1

 

s

w

e

r

c

s

 

8

M

 

r

o

e

u

l

a

v

 

e

u

q

r

o

t

 

e

c

n

e

r

e

f

e

r

 

e

h

T

.t

n

-rceme

.&$)"/*$"-*/45"--"5*0/

Содержание SRP 6MA-BG Series

Страница 1: ...PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO LTD ADDRESS JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG ROAD NO 1 2 TELEPHONE 86 519 68788166 FAX 86 519 88786181 MAILBOX info seraphi...

Страница 2: ...lers should assume all risks of injury that might occur during installation including but not limited to the risk of electric shock One single PV module may generate more than 30V DC when exposed to d...

Страница 3: ...including wires and cables connectors charging regulators inverters storage batteries recharge able batteries etc Under normal outdoor conditions the current and voltage generated will differ from tho...

Страница 4: ...sunlight resources In the Northern Hemisphere the module should typically face south and in the Southern Hemisphere the modules should typically face north The most optimistic installation angle varie...

Страница 5: ...ithstand a downward force of up to 5400 Pa 550 kg m2 the modules shall be fixed on the bracket with the long side of the module using a minimum of four clamps Please make sure to use at least of two p...

Страница 6: ...xed on the bracket with the long side of the module using a minimum of four screws Please make sure to use at least of two purlins behind the modules to support the modules The selection and installat...

Страница 7: ...stem voltage the Voc temperature coefficient feature and the extreme low temperature of installation location must be taken into consideration when calculate the Voc of the PV string The PV modules co...

Страница 8: ...ny problem arises consult a professional for suggestions Caution observe the maintenance instructions for all components used in the system such as support frames charging regulators inverters batteri...

Страница 9: ...eet any of the following conditions 1 When the DC side input terminal of the inverter or combiner box is original MC4 2 When the manufacturer of inverter or combiner box requires series DC input bus t...

Отзывы: