
3
SEP LEMO12SD / LEM012SS 2015
functionality of the meter, and will be avoid any warranty.
Do not drop, or allow physical impact to the meter as there are high precision
components inside that may break or render the meter measure accurately.
Exclusion of liability
We have checked the contents of this publication and every effort has been made to
ensure that the descriptions are as accurate as possible.
However, deviations from the description cannot be completely ruled out, so that no
liability can be accepted for any errors or omissions contained in the information
given. The data in this manual are checked regularly and the necessary corrections
are included in subsequent editions. We are grateful for any improvements that you
care to suggest.
Copyright
Copyright (c) 2015 SEP EUROPE All rights Reserved.
It is prohibited to pass on or copy this document or to use or disclose its content
without our express permission. Any duplication is a violation of the law and subject
to criminal and civil penalties. All rights reserved, particularly in the event of a
patent award or utility model registration.
Registered trademarks
SEP EUROPE is registered trademark of Schotman Elektro BV.
1.2 Foreword
Thank you for purchasing the SEP LEM012SD or LEM012SS DIN rail single phase
two wire energy meter. The SEP LEM012SD and the LEM012SS energy meter is an
advanced type electronic energy meter. With the SEP product range we have
introduced a large scale of energy meters on the market suitable for 110VAC to
400VAC (50 or 60Hz)
Although we produce the SEP LEM012SD and the LEM012SS meter according to IEC
62053-21 and our accurate quality inspection there might always be a possibility
that your product shows a fault or failure for which we do apologize. Under normal
conditions your product should give you years of benefit and pleasure. In case there
is a problem with the energy meter you should contact your dealer immediately. All
energy meters are sealed with a special seal. Once this seal is broken there is no
possibility to claim (for) warranty. Therefore NEVER open an energy meter or break
the seal of the energy meter. The warranty time is 12 months, after purchase, and
only valid for construction faults.