Sentry Saf-T-Vise STV-LP1 Скачать руководство пользователя страница 17

Saf-T-Vise STV-LP1 & Saf-T-Vise STV-LP2 17

Standard Warranty

Sentry Equipment Corp (“Seller”) warrants products manufactured by it and supplied hereunder (“Products”) to be free 

from defects in workmanship and, to the extent materials are selected by Seller, to be free from defects in materials, in 

each case for a period as defi ned in the table below:

Product Line

Product Category

Warranty Period

Sentry®

1 . Automatic Sampling
2 . Corrosion Monitoring
3 . Manual Sampling
4 . Sample Conditioning
5 . Sampling & Analysis Systems
6 . Replacement Parts (without expiration dates)

Eighteen months from date of shipment 

or twelve months from startup, whichever 

occurs fi rst

Waters Equipment

1 . Sampling & Analysis Systems
2 . Replacement Parts (without expiration dates)

Twelve months from date of shipment

To view the full warranty, go to 

www .sentry-equip .com/warranty

 .

Customer Support

With proven sampling expertise since 1924, Sentry products and services provide business operations the critical 

insights to optimize process control and product quality . We deliver true representative sampling and analysis 

techniques to customers around the globe, empowering them to accurately monitor and measure processes for 

improved production effi  ciency, output, and safety . Standing behind our commitments, we are determined to tackle 

any application, anywhere .

We know that running an effi  cient operation isn’t easy . It requires thorough, careful analysis of controlled, real-

time data achieved through reliable, accurate, and repeatable process monitoring, and measuring . By eff ectively 

conditioning, sampling, and measuring gas, liquid, slurry, powder, solids, steam, or water within their production 

environments, our customers obtain the critical insights they need to control and optimize their processes .

Yet, controlling your processes also means reliable customer support throughout the life cycle of your equipment .

 

ƒ

Customer Service—General information, warranty claims, order management .

 

ƒ

Installation Service—For systems that require specialized expertise upon installation .

 

ƒ

Technical Support—Troubleshooting, training, and technical manuals .

 

ƒ

Field Service & Retrofi ts—When a problem needs immediate attention .

 

ƒ

Replacements Parts & Consumables—Order your replacement parts and consumables .

 

ƒ

Sentry ProShield Services—Select from four ProShield Guardian service plans providing diff erent levels of support to 

protect your large system investments with regularly scheduled maintenance .

To learn more, go to 

www .sentry-equip .com/support

 .

Содержание Saf-T-Vise STV-LP1

Страница 1: ...Original Instructions Installation Operation Maintenance Manual Saf T Vise STV LP1 Saf T Vise STV LP2 Insertable Tool Holders S CM IOM 00505 2 3 22...

Страница 2: ...ability Sentry Equipment Corp its employees agents and the authors and contributors to this document specifically disclaim all liabilities and warranties express or implied including warranties of mer...

Страница 3: ...allation 6 Operation 7 Insertion 7 Retraction 9 Maintenance 10 Inspecting the Hand Insertion Knob 10 Prepping the Tool Holder for Reinstallation 10 Cleaning the Rod Probe Shaft 10 Changing a Rod Shaft...

Страница 4: ...ons DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or serious inj...

Страница 5: ...orking with any chemical Read the product label and Material Safety Data Sheets MSDS carefully and follow the instructions exactly Potential Equipment Hazards Hot surfaces This equipment may have very...

Страница 6: ...mes standard with tool threads allowing the use of a tool for the retraction of a bent or stuck rod Specifications STV LP1 STV LP2 weight 4 to 7 lb 1 8 to 3 2 kg 10 to 35 lb 4 5 to 16 kg materials 316...

Страница 7: ...to prevent incidental opening while installing the unit 2 Determine desired insertion depth a Measure from the top of pipeline isolation valve to the desired zone within the process TIP Tool compensa...

Страница 8: ...e Check for leaks NOTE If graphoil seal leaks a Close isolation valve b Slowly open bleeder valve c Loosen set screw that secures upper body to lower body d Tighten upper body onto lower body re tight...

Страница 9: ...and remove the chain 2 Retract rod shaft from pipeline a Retract the rod shaft completely into the holder b Re tighten the locking collet bolt to 35 ft lb 47 45 Nm 3 Slowly close the process isolatio...

Страница 10: ...Reapply Teflon tape and anti seize lubricant to the holder threads Cleaning the Rod Probe Shaft The rod probe shaft should be cleaned each time the tool holder is removed from the line This helps prev...

Страница 11: ...t bolt to 35 ft lb 47 45 Nm c Remove adapter Coupon holder only If using a flat coupon use a permanent marker to mark the rod to show where the edge of the coupon is oriented Use a medium adjustable w...

Страница 12: ...aight into the body of the holder to avoid side loading the seal 4 Reassemble the holder a Apply a small amount of anti seize lubricant to the lower body threads where the upper body threads on Do not...

Страница 13: ...stall the locking collet if removed and tighten f Remove the protective Teflon tape from the rod shaft g For atomizer or quill shaft only reapply new Teflon tape 2 3 wraps is adequate Coupon holder ro...

Страница 14: ...ll the tool holder into the pipeline by following instructions for insertion Troubleshooting Leaks Multi Port Valve Leaks 1 Isolate and bleed down the pressure and attempt to tighten the leak point If...

Страница 15: ...ged and requires replacement See section on Seal Replacement Graphoil Seal If the holder is leaking from the top of the holder body where the rod shaft and body meet the graphoil seal is most likely l...

Страница 16: ...performed by the factory Rod shaft marred by collet 1 Check collet orientation If the collet has an orientation indicator dot see photo the indicator dot must always face toward the top of the holder...

Страница 17: ...to accurately monitor and measure processes for improved production e ciency output and safety Standing behind our commitments we are determined to tackle any application anywhere We know that runnin...

Страница 18: ...18 Sentry Equipment Corp This page is intentionally left blank...

Страница 19: ...Saf T Vise STV LP1 Saf T Vise STV LP2 19 This page is intentionally left blank...

Страница 20: ...sentry equip com 966 Blue Ribbon Circle North Oconomowoc WI 53066 U S A 1 262 567 7256 support sentry equip com Serving customers in more than 50 countries across six continents worldwide...

Отзывы: