Sentry Saf-T-Vise STV-LP1 Скачать руководство пользователя страница 15

Saf-T-Vise STV-LP1 & Saf-T-Vise STV-LP2 15

Seal Leaks

Saf-T-Vise STV-LP1 Seal Replacement:

1. 

Remove the hex plug using the stub hex socket . (The bleed valve may need to be loosened to allow the stub socket 

to reach the hex plug .)

2. 

Insert the threaded end of the tube or rod into the top of the LP1 body to push out the old seal and backing ring . 

The threaded end grips the old seal and backing ring in order to push them out of the LP1 body ID pocket .

3. 

Install a new seal using the seal insertion hand tool . 

a. 

Place the seal and backing ring on the seal insertion hand tool as shown in the image .

b. 

Use the stub hex socket and a 6-inch extension to start the hex plug hand tight into the LP1 body .

 

Â

NOTE

Using a standard hex tool will damage the seal .

4. 

Torque the ID hex plug to 35 ft-lb to complete seal installation .

Teflon Seal: 

If the holder is leaking from the top of the holder body where the rod/shaft and body meet, the Teflon seal is damaged 

and requires replacement . See section on Seal Replacement .

Graphoil Seal: 

If the holder is leaking from the top of the holder body where the rod/shaft and body meet, the graphoil seal is most 

likely loose . 

1. 

Adjust the top body to tighten the seal .

a. 

Loosen the set screw on the upper body . The set screw typically has a hex head .

b. 

Using an adjustable wrench on the top body wrench flats, turn the upper body clockwise in 1/4-turn increments 

until the leak stops .

c. 

Turn the upper body an additional 1/4 turn clockwise .

d. 

Re-tighten the set screw on the upper body to prevent the body from loosening .

2. 

If leak persists, the graphoil seal is damaged and requires replacement . See section on Seal Replacement .

Connection Leaks

1. 

If the holder leaks from any threaded portion, immediately isolate the holder from the line and remove process 

pressure .

2. 

Remove the holder from the isolation valve .

3. 

Follow the procedure for Prepping a Holder for Reinstallation . 

 

– This procedure can be used for all connection points on a holder including the fluid inlet assembly, probe shaft 

adapters, bleeder valves, and any other connections that may be on the holder .

Содержание Saf-T-Vise STV-LP1

Страница 1: ...Original Instructions Installation Operation Maintenance Manual Saf T Vise STV LP1 Saf T Vise STV LP2 Insertable Tool Holders S CM IOM 00505 2 3 22...

Страница 2: ...ability Sentry Equipment Corp its employees agents and the authors and contributors to this document specifically disclaim all liabilities and warranties express or implied including warranties of mer...

Страница 3: ...allation 6 Operation 7 Insertion 7 Retraction 9 Maintenance 10 Inspecting the Hand Insertion Knob 10 Prepping the Tool Holder for Reinstallation 10 Cleaning the Rod Probe Shaft 10 Changing a Rod Shaft...

Страница 4: ...ons DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or serious inj...

Страница 5: ...orking with any chemical Read the product label and Material Safety Data Sheets MSDS carefully and follow the instructions exactly Potential Equipment Hazards Hot surfaces This equipment may have very...

Страница 6: ...mes standard with tool threads allowing the use of a tool for the retraction of a bent or stuck rod Specifications STV LP1 STV LP2 weight 4 to 7 lb 1 8 to 3 2 kg 10 to 35 lb 4 5 to 16 kg materials 316...

Страница 7: ...to prevent incidental opening while installing the unit 2 Determine desired insertion depth a Measure from the top of pipeline isolation valve to the desired zone within the process TIP Tool compensa...

Страница 8: ...e Check for leaks NOTE If graphoil seal leaks a Close isolation valve b Slowly open bleeder valve c Loosen set screw that secures upper body to lower body d Tighten upper body onto lower body re tight...

Страница 9: ...and remove the chain 2 Retract rod shaft from pipeline a Retract the rod shaft completely into the holder b Re tighten the locking collet bolt to 35 ft lb 47 45 Nm 3 Slowly close the process isolatio...

Страница 10: ...Reapply Teflon tape and anti seize lubricant to the holder threads Cleaning the Rod Probe Shaft The rod probe shaft should be cleaned each time the tool holder is removed from the line This helps prev...

Страница 11: ...t bolt to 35 ft lb 47 45 Nm c Remove adapter Coupon holder only If using a flat coupon use a permanent marker to mark the rod to show where the edge of the coupon is oriented Use a medium adjustable w...

Страница 12: ...aight into the body of the holder to avoid side loading the seal 4 Reassemble the holder a Apply a small amount of anti seize lubricant to the lower body threads where the upper body threads on Do not...

Страница 13: ...stall the locking collet if removed and tighten f Remove the protective Teflon tape from the rod shaft g For atomizer or quill shaft only reapply new Teflon tape 2 3 wraps is adequate Coupon holder ro...

Страница 14: ...ll the tool holder into the pipeline by following instructions for insertion Troubleshooting Leaks Multi Port Valve Leaks 1 Isolate and bleed down the pressure and attempt to tighten the leak point If...

Страница 15: ...ged and requires replacement See section on Seal Replacement Graphoil Seal If the holder is leaking from the top of the holder body where the rod shaft and body meet the graphoil seal is most likely l...

Страница 16: ...performed by the factory Rod shaft marred by collet 1 Check collet orientation If the collet has an orientation indicator dot see photo the indicator dot must always face toward the top of the holder...

Страница 17: ...to accurately monitor and measure processes for improved production e ciency output and safety Standing behind our commitments we are determined to tackle any application anywhere We know that runnin...

Страница 18: ...18 Sentry Equipment Corp This page is intentionally left blank...

Страница 19: ...Saf T Vise STV LP1 Saf T Vise STV LP2 19 This page is intentionally left blank...

Страница 20: ...sentry equip com 966 Blue Ribbon Circle North Oconomowoc WI 53066 U S A 1 262 567 7256 support sentry equip com Serving customers in more than 50 countries across six continents worldwide...

Отзывы: