Sentry Saf-T-Vise STV-HP1 Скачать руководство пользователя страница 7

Saf-T-Vise STV-HP1 and STV-HP3 7

Maintenance

 

Â

NOTE

All maintenance procedures assume the 

Saf-T-Vise STV-HP1

 or STV-HP3 insertable tool holder has been properly removed 

from the line . See 

the Saf-T-Vise STV-T Series Insertion Tools manual 

for instructions .

Inspecting the Safety Cap

 

ƒ

Remove safety cap from holder and ensure the red indicator is still in good condition  

 

ƒ

If the indicator is faded, brittle, or missing, return the cap to the factory for indicator repair 

Prepping the Tool Holder for Reinstallation

After each use the tool holder threads should be checked and cleaned  

Tools needed

 

ƒ

Clean rag

 

ƒ

Pick or small screwdriver

 

ƒ

Teflon tape or paste

 

ƒ

Anti-seize lubricant

1. 

Use a small pick or screwdriver to remove Teflon tape from the threads of the holder and the isolation valve 

connection threads 

2. 

After tape and debris are removed, wipe down the threads with a clean rag  

3. 

Reapply Teflon tape and anti-seize lubricant to the holder threads 

Cleaning the Rod/Probe Shaft

The rod/probe shaft should be cleaned each time the tool holder is removed from the line  This helps prevent buildup 

on the rod/shaft and damage to the seal 

Tools needed

 

ƒ

Clean rag

 

ƒ

Cleaner/solvent

 

ƒ

320 grit sand paper or other finer grit paper 

 

ƒ

Medium crescent wrench

 

ƒ

Molykote 55 lubricant or other fine viscosity lubricant 

1. 

Remove the holder from the line 

2. 

Loosen the locking collet bolt and slide the rod/shaft to the fully inserted position (until the stop hits the top of the 

body)  Leave the locking collet loose so the rod/shaft can be spun inside the body 

3. 

Clean the exposed rod/shaft with 320 grit or finer sand paper using a rotational motion  

4. 

When the exposed rod/shaft is cleaned of external debris, wipe the rod/shaft with a clean rag and solvent to remove 

any leftover debris 

5. 

Slide the rod/shaft to the fully retracted position and repeat the steps above to clean the remaining rod/shaft  

6. 

When the rod/shaft is thoroughly clean, wipe the rod/shaft with Molykote 55 lubricant or other fine viscosity 

lubricant  

Содержание Saf-T-Vise STV-HP1

Страница 1: ...Original Instructions Installation Operation Maintenance Manual Saf T Vise STV HP1 and STV HP3 Insertable Tool Holders S CM IOM 00506 3 03 22...

Страница 2: ...ability Sentry Equipment Corp its employees agents and the authors and contributors to this document specifically disclaim all liabilities and warranties express or implied including warranties of mer...

Страница 3: ...V HP3 Insertable Tool Holder Specifications 6 Installation and Operation 6 Maintenance 7 Inspecting the Safety Cap 7 Prepping the Tool Holder for Reinstallation 7 Cleaning the Rod Probe Shaft 7 Changi...

Страница 4: ...ons DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or serious inj...

Страница 5: ...ing with any chemical Read the product label and Material Safety Data Sheets MSDS carefully and follow the instructions exactly Potential Equipment Hazards Hot surfaces This equipment may have very ho...

Страница 6: ...wable operating pressure MAP of 5 000 psi at 100 F 344 7 bar at 38 C for the STV HP1 and 7 500 psi at 100 F 517 1 bar at 38 C for the STV HP3 NOTE Flanged units have a MAP based on the class of flange...

Страница 7: ...d anti seize lubricant to the holder threads Cleaning the Rod Probe Shaft The rod probe shaft should be cleaned each time the tool holder is removed from the line This helps prevent buildup on the rod...

Страница 8: ...arrow at the top of the shaft Use a medium crescent wrench to loosen the adapter lock nut Remove both the adapter and the lock nut Atomizer shaft or quill shaft With a permanent marker mark the rod t...

Страница 9: ...For Teflon seal Tighten the upper body until it is snug against the lower body Tighten set screw For graphoil seal Do not tighten the set screw until after installation of the rod shaft Thread but do...

Страница 10: ...mount of anti seize lubricant to the shaft end take special care not to get any anti seize lubricant in the shaft as this could clog your nozzle tip b Thread the fluid adapter onto the shaft and tight...

Страница 11: ...eaking from the top of the holder body where the rod shaft and body meet the graphoil seal is most likely loose 1 Adjust the top body to tighten the seal a Loosen the small set screw on the upper body...

Страница 12: ...ard the top of the holder and then reinstall the locking collet bolt 2 Check the collet for wear A worn collet will not distribute pressure evenly on the rod shaft and may cause damage If the collet i...

Страница 13: ...conditioning sampling and measuring gas liquid slurry powder solids steam or water within their production environments our customers obtain the critical insights they need to control and optimize the...

Страница 14: ...14 Sentry Equipment Corp This page is intentionally left blank...

Страница 15: ...Saf T Vise STV HP1 and STV HP3 15 This page is intentionally left blank...

Страница 16: ...sentry equip com 966 Blue Ribbon Circle North Oconomowoc WI 53066 U S A 1 262 567 7256 support sentry equip com Serving customers in more than 50 countries across six continents worldwide...

Отзывы: