M2MNV
CHECKING
1) Terminal wiring: Check that all cables are correctly con-
nected according to the connection diagram.
2) Power input voltage: Check voltage across the terminal
10 – 11 with a multimeter.
3) Switching command contact: Confirm adequate opera-
tions of the contact signal.
TERMINAL CONNECTIONS
Connect the unit as in the diagram below or refer to the con-
nection diagram on the side of the unit.
U(+)
V(–)
POWER
10
11
1
7
8
2
4
5
B1-1
B1-2
A1-1
A1-2
A2-1
A2-2
3
6
9
SWITCHING
COMMAND
SW1
■
INTERLOCKING SWITCHING CONTROL
(single-pole contact)
U(+)
V(–)
POWER
10
11
1
7
8
2
4
5
B1-1
B1-2
A1-1
A1-2
A2-1
A2-2
3
6
9
SWITCHING
COMMAND
SW1
■
INDEPENDENT SWITCHING CONTROL
(double-pole contact)
SW2
EXTERNAL DIMENSIONS
unit: mm (inch)
4
8 7
10
11
5
6
1
2
3
9
22 (.87)
6 (.23)
59 (2.32)
11–M3
SCREW
72 (2.83)
29.5 (1.16)
2–4.2x5
(.17x.20)
MTG HOLE
6 (.24) deep
• When mounting, no extra space is needed between units.
23 (.91)
72 (2.83)
84 (3.31)
10 (.39)
DIN RAIL
35mm wide
[4 (.16)]
114 (4.49)
4 (.16)
Rugghölzli 2
CH - 5453 Busslingen
Tel. +41 (0)56 222 38 18
Fax +41 (0)56 222 10 12
www.sentronic.com
Produkte, Support und Service
SENTRONIC
AG