14
STARTUP and PROGRAMMING
Apply Power
Caution: Before applying
power,
double-check
all
wiring.
Once the installation has been
completed, and wiring has been
checked, close the door to the
monitor and apply power. The unit
will go through its normal startup
checks and warm-up procedure. It is
important that the door remain
closed to ensure a proper operation.
Initial Screens
If the IR-SNIF-1,2,3 has never been
programmed, it will access default
memory settings and display the
following screen:
Once the defaults have been stored,
or if the monitor has been previously
programmed, the following screen
will be displayed. Since the monitor
is factory calibrated, and factory
programmed during quality control, it
should display this screen on initial
application of power.
Following memory initialization, the
monitor will display the copyright
screen.
The monitor will next display two
Contact and Model Information
screens. (Note: these screens can
be accessed anytime during normal
operation by pressing the “*” key.)
Following display of the contact and
model information screens, the IR-
SNIF-1,2,3 will restore any alarms
that have been saved into memory.
The corresponding lights and relays
will be energized. Any external
alarms, exhaust fans or building
management system connections
will be activated. The monitor will
then display the following optics
warm-up screen.
restore from memory
RESETTING DEFAULTS
SenTech
Corporation
Phone 1-888-248-1988
www.sentechcorp.com
Model IR-SNIF-1,2,3
Version 3017
Option Code 0
www.sentechcorp.com
SenTech Corporation
IR-SNIF-1,2,3
Gas Monitor
Copyright (c) 2003
Optics Warm up
Timer 540 12:00
Press ENT for Menu
Содержание IR-SNIF-1
Страница 50: ...47 05 20 2008 ...