3
INSTALLATION AND OPERATION INSTRUCTIONS — FENCE PROTECTION SYSTEMS
Mount each FPS-3 Dual Zone Pre-Amp processor as shown in Figure 2.
•
Use metal brackets or Unistrut-type mounting material to provide a solid backing. A fence post
will provide a solid mounting.
•
Arrange the conduit/control wiring entrance as shown.
•
Install a copper-clad ground rod at each processor location, and connect a minimum 8-gauge
ground wire to the processor bolt as shown. IMPORTANT: Connect the ground wire directly to
the enclosure stud as shown.
Figure 2. Fence Mounted Dual Zone Pre-Amp
Ground
MUST
be
attached to grounding
stud here.
Unistrut type
mounting
Approx. 12" apart
on center.
Install copper-clad
ground rod per
National Electrical Code
To FPS-3 Central
Controller
Watertight com-
pression fittings
GROUND ROD
CONNECTION
FPS-3
DUAL ZONE
PRE-AMP