8
Putting the ACA 1 into operation
Putting the ACA 1 into operation
Preparing the ACA 1 for use
!
Place the ACA 1 on a flat, horizontal surface.
Mounting the ACA 1 into a 19” rack
Please note that the device feet can leave stains on
delicate surfaces!
CAUTION!
Risks when rack mounting the device!
When installing the device in a closed or multi-rack assembly,
please consider that, during operation, the ambient tempera-
ture, the mechanical loading and the electrical potentials will be
different from those of devices which are not mounted into a
rack.
!
The ambient temperature within the rack must not exceed
the temperature limit specified in the specifications.
!
Ensure sufficient ventilation; if necessary, provide additional
ventilation.
!
Make sure that the mechanical loading of the rack is even.
!
When connecting to the power supply, observe the
information indicated on the NT 3-1 table top power supply.
Avoid circuit overloading. If necessary, provide overcurrent
protection.
!
When rack mounting, please note that intrinsically harmless
leakage currents of the individual power supplies may
accumulate, thereby exceeding the allowable limit value. As
a remedy, ground the rack via an additional ground
connection.