B
R E A K T A N K
H
A ND B O O K
06/2015 V4.0
21
!
The SEM Breaktank works on 230V / 50Hz. This tension is life-threatening. Leave the work
on the electrical installation to the professional.
•
Now connect the wiring of the solenoid valve to the terminals
KLEP1 (+ 24V + brown) and OUT (- blue) of the control box. See also the connection
diagram below.
•
The Breaktank can now be put into operation. Possibly the parameters Ha and Hb can be
adjusted. These are already correct from the factory.
Содержание 2502925
Страница 2: ......
Страница 3: ...Breaktank 6 2015 art nr 2502925 EN1717 EN13077...
Страница 13: ...BREAKTANK HANDBOOK 06 2015 V4 0 10 2 4 Schematic representation of menu structure...
Страница 17: ...BREAKTANK HANDBOOK 06 2015 V4 0 14 Characteristics of the feed pump Compact break tank...
Страница 25: ...BREAKTANK HANDBOOK 06 2015 V4 0 22 Notes...