35
www.selwood.com
Step 16: Attach Hand Grip to Fort
A:
Measure 6” (152.4 mm) from the top of the floor boards on the left hand side of the Rock Board, pre-drill
with a 1/8” (3.2 mm) drill bit then attach 1 Play Handle with 2 (WL3) Wafer Lags to the Back Wall. (fig. 16.1)
Play Handle
Other Parts
1 x Play Handle
6”
Hardware
2 x
Wafer Lag
WL3
Fig. 16.1
WL3
(152.4
mm)
Содержание Mint
Страница 57: ...57 www selwood com NOTES NOTES ...
Страница 58: ......