12
www.selwood.com
Step 3: Swing Wall Prep
Part 1
It is important to assemble the frame on a flat, smooth surface.
A:
Place (2757) LT Post Assembly and (2758) RT Post Assembly on a hard, flat surface with the notches facing
down. The top of the post assemblies have the longer notches. (fig. 3.1)
B:
Tap 1 (TN2) T-nut in the top holes and 1 (TN1) T-nut in the middle and bottom holes. (fig. 3.1).
2 x
T-nut
4 x
T-nut
1 x
LT Post Assembly
1 x
RT Post Assembly
2757
Wood Parts
Hardware
2758
Fig. 3.1
Bottom
Top
2757
2758
Notice longer
notches at
the top (both
boards)
Notice shorter
notches at the
bottom (both
boards)
TN1
TN2
TN1
TN2
Содержание Mint
Страница 57: ...57 www selwood com NOTES NOTES ...
Страница 58: ......