
4
© Selecto, Inc.
INSTALLATION PROCEDURES
INSTALL FILTER HEAD:
For
Hard Copper Pipe
Installing (steps 1 to 5 of 10):
A.
Filter Head Assembly
1.
Center, level, and mount the
filter head
3.
Pull and separate inlet Shut-Off
valve fitting
2.
Remove blue clip from inlet side
4.
Connect inlet fitting onto 3/4”
hard piping
B.
You can slide the heads out toward either side of
channel to separate backplate for easy installation
5.
Reconnect plastic fitting back to
the filter head
Tap Water
Inlet
Filtered Water
Outlet