Sekotech GRANAT-2 Скачать руководство пользователя страница 4

 

 

1.3. Delivery Set. 

1.3.1. Product Delivery Set is specified in Table 1. 

 

1.4. Principal of operation. 

1.4.1.  The  main  components  of  the  device  and  control  layout  are  shown  in 

Figure 1. 

 

 

 
 

 

 
 

 

 

Figure 1 

Table 1 

Name 

Pcs  Note 

GRANAT-2 

 

CR123А battery 

 

Cloth for cleaning optics 

 

Operation Manual 

 

Data sheet 

 

Delivery package (cover) 

 

Battery 
compartment  

Pulse radiation 
power button 

Mounting for strap  
 

Eyepiece 

LED emitters 

Continuous radiation 
power button 

Содержание GRANAT-2

Страница 1: ...Detector of Hidden Television Surveillance Systems GRANAT 2 Operating manual...

Страница 2: ...Technical parameters 3 1 3 Delivery set 4 1 4 Principal of operation 4 1 5 Marking 5 1 6 Packing 5 2 PROPER USE 5 2 1 Operational restrictions 5 2 2 Getting started 5 2 3 Product use 6 2 4 Safety mea...

Страница 3: ...e 1 2 Technical parameters 1 2 1 Minimum diameter of HTSS pupil detected 1 mm 1 2 2 Detection range minimum 2 0 1 m maximum 25 0 5 m 1 2 3 Operating observation field 8 1 2 4 Maximum zoom 4 1 2 5 Prob...

Страница 4: ...of the device and control layout are shown in Figure 1 Figure 1 Table 1 Name Pcs Note GRANAT 2 1 CR123 battery 1 Cloth for cleaning optics 1 Operation Manual 1 Data sheet 1 Delivery package cover 1 B...

Страница 5: ...arkings other information specified in the supply contract 1 5 2 The product is sealed on a standard package cover The product itself is not sealed 1 6 Packing 1 6 1 The product is packed in a standar...

Страница 6: ...pressed 2 4 Safety measures 2 4 1 In case of fire on the device power off the device and to take measures to put out fire 2 4 2 In case of emergency operating conditions high temperature humidity vibr...

Страница 7: ...ing in a vertical position is not allowed 5 2 Storage life 5 2 1 Storage life of the product in a standard package is 1 year without batteries in heated ventilated premises at ambient temperature from...

Страница 8: ...strokes During loading and unloading and transporting the requirements of handling marks on the shipping container must be strictly observed 6 3 Transport characteristics of the product 6 3 1 Dimensi...

Отзывы: