Seiki Vista Plus Screen Скачать руководство пользователя страница 12

12

Installing the 

Bottom Rail

and adjusting the Catch

If the Bottom Rail did not require cutting, it is important to

select the correct Bottom Rail for installation. The Vista Plus

Screen package comes with two Bottom Rails to

accommodate both flat and angled door sills.

Please refer to 

(A)

to determine the correct Bottom Rail.

1.

Remove the backing on the adhesive strip on
the Bottom Rail.

2.

While slightly lifting the Sliding Bar,
insert one end of the Bottom Rail
into the groove at the bottom of
the Sliding Bar Bottom Cap.

(B)

NOTE:

If using the Angled Bottom Rail, ensure

that it is oriented so that the top of the Bottom Rail
is flat and level when placed on the door sill.

3.

Position the other end so that the center of the Catch Frame aligns with the center of the
Bottom Rail.

(C)

When aligned, press the Bottom Rail firmly onto the door sill.

4.

Fasten the Bottom Rail to the door sill using the
5/8” (16 mm) Self-Tapping Screws provided.
It is not necessary to pre-drill the surface
below.

Adjusting the Catch

1.

Loosen the screw on the Catch.

2.

Move the Catch up and down, until the position
where the Latch makes a secure contact with
the Catch is determined. Tighten the screw on
the Catch to secure it in place.

(D)

3.

Adhere the Stickers to the front and rear of the
Latch as indicated.

(E)

Bottom Rail T

y

pe “B”

An

g

le

d

 Surfa

c

e

Bottom Rail T

y

pe “A”

Flat Surfa

c

e

Bottom

Rail

Bottom

Rail

Sli

d

in

g

Bar

S

c

reen Housin

g

Bottom Rail

Ali

g

n The 

Centre

Cat

c

h

Frame

5/8” (1

6

 mm)

Self Tappin

g

S

c

rew

Sli

d

in

g

 Bar

Lat

c

h

Cat

c

h

Frame

Cat

c

h

Sti

c

ker

Lat

c

h

Sti

c

ker

B

A

C

D

E

Содержание Vista Plus Screen

Страница 1: ...tallation Manual for For right hinged doors Durable Reliable Attractive For door openings up to 36 914 mm wide and 81 1 4 2 064 mm high Quick and Easy to Size and Install Vista PLUS SCREEN PX11 0601R...

Страница 2: ...Screen will provide years of dependable operation Plus it comes with a factory supplied limited lifetime warranty on all parts against manufacturer s defects The Vista Plus Screen was designed for eas...

Страница 3: ...he Screen Housing 10 Installing the Top Rail 11 Installing the Bottom Rail 12 Final Steps 13 For installations on double doors French doors one left Vista Plus Screen and one right Vista Plus Screen a...

Страница 4: ...rface as indicated in diagram A To ensure that the Vista Plus Screen is fullly recessed after installation there must be at least 1 5 8 42 mm of mounting surface However the Vista Plus Screen can acco...

Страница 5: ...crews 2pcs for Bottom Rail Stickers 2pcs for Latch Top Rail Before beginning make sure that all these parts are included in the Vista Plus Screen package Hack saw 32tpi Philips screwdriver Electric dr...

Страница 6: ...oor sill at the point where the Vista Plus Screen will be installed Seiki recommends positioning the Vista Plus Screen flush with the outside edge of the door frame the furthest point away from the do...

Страница 7: ...d Bottom Rails To determine the length to be cut from the Top and Bottom Rails use the following formula Determining Length to be Cut from Screen Housing Assembly and Catch Frame To determine the leng...

Страница 8: ...sills Please refer to B to determine the correct Bottom Rail 1 Using the same Length to be cut dimension used for the Top Rail measure and mark the appropriate Bottom Rail on all sides to ensure an ev...

Страница 9: ...gned with top of the Assembly and the mesh B 3 Slide the Mounting Bracket until its upper edge is aligned with the upper edge of the Screen Housing Assembly C 4 With all components aligned carefully m...

Страница 10: ...Mounting Bracket will be positioned with this edge closest to the door 2 Remove the adhesive strip on the back of the Mounting Bracket and position on the mounting surface B 3 Using a level adjust the...

Страница 11: ...secure with the 1 1 4 32 mm Wood Screws provided Installing the Catch Frame 1 Insert the Catch Frame into the bottom of the Top Rail End Cap Ensure that the Top Rail End Cap fits tight to the left sid...

Страница 12: ...sill 3 Position the other end so that the center of the Catch Frame aligns with the center of the Bottom Rail C When aligned press the Bottom Rail firmly onto the door sill 4 Fasten the Bottom Rail to...

Страница 13: ...ration A until meeting with resistance but without over tightening Adjusting Spring Tension 1 If the Vista Plus Screen does not retract fully or quickly enough turn the dial on the Spring Tension Adju...

Страница 14: ...dirt and debris and may cause the Vista Plus Screen to react abnormally However the periodic application of a dry silicon lubricant to the moving parts is permissible We recommend that while not in u...

Страница 15: ...entire process If there are any questions during the installation of the Vista Plus Screen we recommend visiting the Seiki Website at www seikiscreensystems com na Seiki provides a number of online ma...

Страница 16: ...arranty is restricted to the corrective actions as set forth herein and contrarily repudiates all incidental and consequential damage It is the responsibility of the consumer to notify Seiki Screen Sy...

Отзывы: