Seiki Vista Plus Screen Скачать руководство пользователя страница 10

10

Installing the Mounting Bracket and 

Screen Housing Assembly

Securing the Mounting Bracket 

The Mounting Bracket of the Vista Plus Screen is installed

on the right inside surface of the door frame. The ideal

minimum dimension of this surface is 1 5/8” (42 mm).

This surface must be perfectly flat and at a right angle

(90º) to the door.

If the mounting surface is greater than 1 5/8” (42 mm),

the Mounting Bracket can be positioned anywhere on this

surface. Seiki recommends positioning the Mounting

Bracket flush with the edge of the door frame (the

furthest point away from the door.) 

1.

Locate the “L” shaped edge of the Mounting Bracket.

(A)

The Mounting Bracket will be positioned with

this edge closest to the door.

2.

Remove the adhesive strip on the back of the
Mounting Bracket and position on the mounting
surface.

(B)

3.

Using a level, adjust the Mounting Bracket to ensure
that it is positioned plumb.

4.

Attach the Mounting Bracket to the door frame using
the 5/8” (16 mm) Pan Head Screws provided.

Attaching the Screen Housing Assembly

1.

Place the front right corner of the Screen Housing
Assembly in the outside edge of the Mounting
Bracket.

(C)

2.

Pivot the Screen Housing along this point until the
back of the Assembly snaps into the “L” shaped
edge on the back of the Mounting Bracket.

Mounting Bracket

5/8” (16 mm)
Screw

“L” Shaped Edge

Mounting Surface

Mountin

g

 Bra

c

ket

S

c

reen Housin

g

Snap S

c

reen Housin

g

 into “L” Shape

d

E

dg

e of Mountin

g

  Bra

c

ket

S

c

reen

Housin

g

Mountin

g

Bra

c

ket

A

C

B

Содержание Vista Plus Screen

Страница 1: ...tallation Manual for For right hinged doors Durable Reliable Attractive For door openings up to 36 914 mm wide and 81 1 4 2 064 mm high Quick and Easy to Size and Install Vista PLUS SCREEN PX11 0601R...

Страница 2: ...Screen will provide years of dependable operation Plus it comes with a factory supplied limited lifetime warranty on all parts against manufacturer s defects The Vista Plus Screen was designed for eas...

Страница 3: ...he Screen Housing 10 Installing the Top Rail 11 Installing the Bottom Rail 12 Final Steps 13 For installations on double doors French doors one left Vista Plus Screen and one right Vista Plus Screen a...

Страница 4: ...rface as indicated in diagram A To ensure that the Vista Plus Screen is fullly recessed after installation there must be at least 1 5 8 42 mm of mounting surface However the Vista Plus Screen can acco...

Страница 5: ...crews 2pcs for Bottom Rail Stickers 2pcs for Latch Top Rail Before beginning make sure that all these parts are included in the Vista Plus Screen package Hack saw 32tpi Philips screwdriver Electric dr...

Страница 6: ...oor sill at the point where the Vista Plus Screen will be installed Seiki recommends positioning the Vista Plus Screen flush with the outside edge of the door frame the furthest point away from the do...

Страница 7: ...d Bottom Rails To determine the length to be cut from the Top and Bottom Rails use the following formula Determining Length to be Cut from Screen Housing Assembly and Catch Frame To determine the leng...

Страница 8: ...sills Please refer to B to determine the correct Bottom Rail 1 Using the same Length to be cut dimension used for the Top Rail measure and mark the appropriate Bottom Rail on all sides to ensure an ev...

Страница 9: ...gned with top of the Assembly and the mesh B 3 Slide the Mounting Bracket until its upper edge is aligned with the upper edge of the Screen Housing Assembly C 4 With all components aligned carefully m...

Страница 10: ...Mounting Bracket will be positioned with this edge closest to the door 2 Remove the adhesive strip on the back of the Mounting Bracket and position on the mounting surface B 3 Using a level adjust the...

Страница 11: ...secure with the 1 1 4 32 mm Wood Screws provided Installing the Catch Frame 1 Insert the Catch Frame into the bottom of the Top Rail End Cap Ensure that the Top Rail End Cap fits tight to the left sid...

Страница 12: ...sill 3 Position the other end so that the center of the Catch Frame aligns with the center of the Bottom Rail C When aligned press the Bottom Rail firmly onto the door sill 4 Fasten the Bottom Rail to...

Страница 13: ...ration A until meeting with resistance but without over tightening Adjusting Spring Tension 1 If the Vista Plus Screen does not retract fully or quickly enough turn the dial on the Spring Tension Adju...

Страница 14: ...dirt and debris and may cause the Vista Plus Screen to react abnormally However the periodic application of a dry silicon lubricant to the moving parts is permissible We recommend that while not in u...

Страница 15: ...entire process If there are any questions during the installation of the Vista Plus Screen we recommend visiting the Seiki Website at www seikiscreensystems com na Seiki provides a number of online ma...

Страница 16: ...arranty is restricted to the corrective actions as set forth herein and contrarily repudiates all incidental and consequential damage It is the responsibility of the consumer to notify Seiki Screen Sy...

Отзывы: