ASSEMBLY AND INSTALLATION
21
6
2
Place the
Billboard Pop Title (MSJ-0001UK)
into the position shown and secure with the (2) highlighted
fixings (secure from the front of the Billboard)
3
Place the
Brkt Billboard R (MSJ-0006UK)
and
Brkt Billboard L (MSJ-0005UK)
into the positions
shown and secure using the (4) highlighted fixings
4
Place the
Billboard Pop Back (MSJ-0003UK)
into position and secure using the (4) highlighted fixings
(secure from the front of the Billboard)