
28
ASSEMBLY AND INSTALLATION
6
1
Unlock and open the Coin Door to access the SW Unit. Use the Test Button to enter the Test and Service
Menu
2
Enter the section “Input Test”. Ensure that all Buttons and Foot Sensors are working correctly
3
Enter the section “Output Test”. Ensure that all LEDs are functioning correctly
6-9 CONFIRMATION OF INSTALLATION
Use test mode to confirm that assembly is proper, connecting boards, and input/output devices are normal. See Sec-
tion 9 “Test and Service Data” for more information on each individual test.
Perform the following tests in test mode:
SW Unit