45
8.
EXPLANATION OF TEST AND DATA DISPLAY
Use the switches on the VTS to enter the TEST MODE. This will allow you to carry out post installation and
periodic checks and adjustments. The following section details the function of each of the tests:
ITEM
DESCRIPTION
INTERVAL
INSTALLATION OF
THE MACHINE
When the machine is installed perform the following
checks:
•
Check to see that each setting is as per the
standard settings input at the time of shipment.
•
In the INPUT TEST mode, check each switch and
V.R.
•
In the OUTPUT TEST mode, check each of the
lamps.
•
In the MEMORY TEST mode check all of the IC’s
on the IC BD.
Monthly
MEMORY
•
On the TEST MENU screen choosing the MEMORY
TEST allows self-test to be performed. In this test
RAM & ROM are tested.
Monthly
PERIODIC CHECKS Periodically perform the following
•
MEMORY TEST.
•
Ascertain each setting.
•
In the INPUT TEST mode, test the control devices.
•
In the OUTPUT TEST mode, check each of the
lamps.
Monthly
CONTROL SYSTEM
•
In the INPUT TEST mode, check each switch and
V.R.
•
Adjust or replace each switch and V.R.
Monthly
MONITOR
•
In the C.R.T. TEST mode, check to ensure the
monitor is adjusted correctly
•
Clean screen (switch off machine and remove the
plug)
Monthly
Weekly
IC BOARD
MEMORY TEST
•
In the SOUND TEST mode, check the sound
related ROMs
Monthly
DATA CHECK
•
Check such data as held in the bookkeeping
screens, relating to number and length of plays
Monthly
EXTERIOR
MAINTENANCE
•
Clean surfaces
•
Lubricate seat sliders
Monthly
COIN MECHANISM
•
Check switch operation (if fitted)
Monthly
Содержание Club Kart Prize
Страница 9: ...8 3 2 NAME OF PARTS...
Страница 10: ...9...
Страница 27: ...26 3 9 2 COMPOSITION OF GAME BOARD PART NO DESCRIPTION 1 840 0137D 02 ASSY CASE NAT CKT PUB EXP...
Страница 49: ...48...
Страница 85: ...84 10 3 SCHEMATIC DRAWING 1 SCHEMATIC DRAWING 1 HERE...
Страница 86: ...85 10 4 SCHEMATIC DRAWING 2 SCHEMATIC DRAWING 2 HERE...