background image

12

Building permits, inspections and approvals by the local utility are generally 
required. 

Where common grounding hardware (nuts, bolts, star washers, spilt-ring lock 
washers, flat washers and the like) is used to attach a listed grounding/bonding 
device, the attachment must be made in conformance with the grounding 
device manufacturer’s instructions.

For grounding and bonding requirements, please refer to regional and national 
safety and electricity standards. If grounding is required, use a recommended 
connector type, or an equivalent, for the grounding wire. 

If grounding is required, the grounding wire must be properly fastened to the 
module frame to assure adequate electrical connection (grounding hole shown 
as drawing 4).

When system operates in high humidity and high temperature circumstances, 
transformer-Based inverter allowing system negative grounding is highly rec-
ommended to achieve mitigating risk of higher power degradation rate.

UL INSTALLATION GUIDE FOR SEG

PHOTOVOLTAIC MODULE

13

Clean the glass surface of the module regularly with clean water and a soft 
sponge or cloth. A mild, non-abrasive cleaning agent may be used to remove 
stubborn dirt.Water with high mineral content is not recommended to clean 
the module. 

Check the electrical, grounding and mechanical connections every six months 
to verify that they are clean, secure, undamaged and free of corrosion. 

If any problem arises, consult a professional for suggestions. 

Caution: observe the maintenance instructions for all components used in the 
system, such as support frames, charging regulators, inverters, batteries etc.   

The  parameters  may  be  updated  time  to  time,  accurate  parameters  please 
check on our website: http://www.segsolar.com or email to our technical support
team: [email protected].

1

it is replaced by new version.

2X

Ø4

 installation

Module

Type

Landscape

Portrait

 installation

UL INSTALLATION GUIDE FOR SEG

PHOTOVOLTAIC MODULE

Содержание SEG BMB-HV Series

Страница 1: ...MODULE ADD T 925 468 4198 2021 V3 0 SEG SOLAR INC SEG SEG Headquarter California office 6200 Stoneridge Mall Rd Ste 300 Pleasanton CA 94588 SEG San Antonio Texas office 973 Isom Road San Antonio TX 7...

Страница 2: ...ETY 2 2 HANDLING SAFETY 2 3 INSTALLATION SAFETY 2 4 FIRE SAFETY 3 PRODUCT IDENTIFICATION 4 MECHANICAL INSTALLATION 4 1 GENERAL INSTALLATION PRINCIPLE 4 2 LOCATION AND ANGLE SELECTION 4 3 SCREW INSTALL...

Страница 3: ...e may generate more than 30V DC when exposed to direct sunlight Access to a DC voltage of 30V or more is potentially hazardous PV modules which convert light energy to DC electrical energy are designe...

Страница 4: ...able batteries etc Under normal outdoor conditions the current and voltage generated will differ from those listed on the datasheet Current and short circuit current should be multiplied by a factor o...

Страница 5: ...owledge background when determining the installation locations and angles Each PV module has 8 mounting holes shown on drawing1 1 The downward mechanical load resistance of module will be different ba...

Страница 6: ...dule with clamps at longsides of frames UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE Module type Type1 1755 1730 1722 1038 200 500 5400 190 500 5...

Страница 7: ...Voltage The Isc tem perature coefficient feature and the extreme high temperature of installation location must be taken into consideration when calculate the Isc of the PV array Please refer to local...

Страница 8: ...ding is highly rec ommended to achieve mitigating risk of higher power degradation rate UL INSTALLATION GUIDE FOR SEG PHOTOVOLTAIC MODULE 13 Clean the glass surface of the module regularly with clean...

Отзывы: