Index
Index
Index
Index
4
4
4
4
Transport, Intermediate storage, Disposal
Transport, Intermediate storage, Disposal
Transport, Intermediate storage, Disposal
Transport, Intermediate storage, Disposal..........................................................................................
..........................................................................................
..........................................................................................
..........................................................................................12
12
12
12
4.1
Safety
4.2
Transport
4.2.1
Dimensions, weight and centre of gravity
4.2.2
Symbol
4.2.3
Lashing points (AP) for lifting devices
4.2.4
Unpacking the machine
4.3
Temporary storage/corrosion protection
4.4
Disposal
5
5
5
5
Assembly / Installation
Assembly / Installation
Assembly / Installation
Assembly / Installation........................................................................................................................
........................................................................................................................
........................................................................................................................
........................................................................................................................ 15
15
15
15
5.1
Mounting tools / lifting gear
5.2
Space requirement
5.2.1
Dimension for stator replacement
5.3
Assembly of the complete mounted pump
5.4
Power supply of the pump
5.5
Pipelines
5.5.1
Suction and pressure connection
5.5.2
Pipeline dimensions
5.5.3
Residue-free pipelines
5.5.4
Tension-free assembly
6
6
6
6
Commissioning / De-Commissioning
Commissioning / De-Commissioning
Commissioning / De-Commissioning
Commissioning / De-Commissioning..................................................................................................
..................................................................................................
..................................................................................................
..................................................................................................17
17
17
17
6.1
Commissioning report............................................................................................................ 17
6.2
Measures before commissioning............................................................................................ 18
6.2.1
Checking pipelines
6.2.2
Protective devices on the pump
6.2.3
Electrical / hydraulic connections
6.2.4
Direction of rotation check
6.2.5
Additional devices - optional
6.3
Initial commissioning/repeated commissioning
6.3.1
Avoiding dry running of the pump
6.3.2
Pressure in the suction and pressure connection
6.4
De-commissioning
6.4.1
Switching off the pump
6.4.2
Emptying the pump
6.4.3
Dismantling the pump
6.4.4
Preservation/storage of the pump
Содержание BTHE 10-12
Страница 2: ......
Страница 6: ......
Страница 16: ...10 ...
Страница 18: ...12 ...
Страница 24: ...18 ...
Страница 52: ...46 ...
Страница 56: ...50 ...
Страница 57: ... Ausgabe issue B 29 03 2011 Dokument document OM SZG 02e Blatt sheet 1 1 10 Spare parts 10 1 Spare parts list ...
Страница 58: ...52 ...
Страница 64: ...58 ...
Страница 66: ...60 ...
Страница 68: ...62 ...
Страница 69: ...63 ...