BRAEMAR RPCQi EVAPORATIVE COOLERS INSTALLATION MANUAL
|
9
ILL1615-A
Turn on the mains water supply to the cooler.
Turn the cooler on at the controller, in “COOL” mode.
Adjust set temperature slider / fan speed buttons to be close
to current room temperature so that fan speed remains low or
manual speed 1.
Isolate power to the cooler electronics and disconnect the
pump, making sure the plug is kept away from any water. Turn
the power back on.
ILL1663-A
SETTING THE WATER LEVEL
ILL2117-A
ILL2118-A
Allow the tank (reservoir) to fill with water. The float valve will
eventually stop the water from entering the cooler. Wait for this
to happen and check the water level.
The float valve must be set to maintain the reservoir water level
about 10 mm below the overflow level. Adjust float by bending
arm to set height.
K
J
I
H
H = Overflow
I = Tank
J = Plastic Nut
K = Threaded Bush
L = O Ring (Between H & K)
10
5
L
TESTING THE DRAIN VALVE
REFITTING THE PAD FRAMES
Refit the pad frames to unit
Ensure all pads have been correctly fitted before attaching and
tightening the pad retaining locking strips with a philip head
screwdriver.
With the wall control in “OFF” mode, press and hold the
and
buttons together for 1 second on the MagIQcool
controller, “dr” is displayed and the drain valve will open.
Select the “SETTINGS” mode on the MagIQtouch Controller
and select the “COOLER” sub-heading. Select the “MANUAL
DRAIN” option to operate and test the drain valve.
A294-B
Test the pump by turning the cooler on at the MagIQtouch
controller, in “COOL” mode. Check that water is evenly
distributed to all pads.
Note!
If the cooler has not been on before it will run a “Pre-Wet”
routine where the pump will operate to saturate the pads.
This cycle takes 2 minutes, then the fan will start automatically.
TESTING THE PUMP
ILL3008
ILL3011