
EVAPORATIVE COOLER INSTALLATION MANUAL
|
3
TBQI/TBSI
ILL2116-B
Step 22
CUSTOMER HANDOVER
Show the customer how to operate the
cooler. Give them both the controller and
cooler owner’s manual.
Explain maintenance requirements.
Page 17
Step 4
REMOVE TRANSITION
Press the clips inwards to release the
transition from the pan (reservoir).
Step 10
INSTALL VENTURI / FAN
Ensure the venturi is fully located into the
pan (reservoir) and the motor lead is not
caught or pinched.
Step 5
MOUNT ROOF JACK
Position, level and secure the roof jack.
Flash the roof jack to prevent water
ingress into the roof cavity.
Step 16
ELECTRICAL CONNECTIONS
Connect the cooler components to the
electronics module. Plug the mains cable
into the electronics module.
Page 5
Page 9
Page 5
Page 12
ILL496-C
QUICK GUIDE
cont.
LCQ Cable exit diagram
Step 6
SECURE ROOF JACK, DUCT
ADAPTOR & TRANSITION
Use the TEK screws provided.
Step 12
INSTALL INLET SOLENOID
Use the supplied hose set and fittings.
Note the water flow direction marking on
the solenoid.
Step 18
SET THE WATER LEVEL
Turn on the mains water and adjust the
float to allow water to fill to the required
level.
Page 8
Page 10
Page 15
Step 17
MOUNT AND CONNECT THE
CONTROLLER
Page 14
Step 11
INSTALL FLOAT VALVE
Assemble the float valve to the cooler.
Ensure all washers and o-rings are in
place. No thread tape is required.
Page 10
Содержание Breezair TBQI
Страница 1: ...INSTALLATION MANUAL TBQI Evaporative Cooler Original English Instructions ...
Страница 22: ...20 ...
Страница 23: ......