
8
|
INSTALLATION INSTRUCTIONS
ILL1052-C
Once the cooler is on the roof, carefully lift the assembly onto
the transition and into place. The assembly will only fit onto
the transition in one orientation. Refer to the engraved details
moulded into the transition.
Ensure that the clips in all four corners engage correctly.
Do not use any screws to fix the cooler to the transition.
Important!
Do not place the venturi assembly into the cooler
at this stage.
MOUNTING THE COOLER
ILL1093-F
TBQI/TBSI
ILL1093-H
ILL1050-C
Carefully convey the cooler to the roof, avoiding scratching the
unit and observing any WHS requirements. If you use a rope or
sling, attach through the central pan (reservoir) hole. Do not use
pillars. Do not drop the cooler. Always handle the cooler with
care.
CONVEYING THE COOLER TO THE ROOF
Caution!
Do not take risks when raising the cooler to the roof
for installation. Use safety equipment, appropriate procedures
and always have assistance.
It is recommended that at least 2 people move the cooler into
position and that the transition, pad frames, venturi assembly
and any unsecured objects are removed beforehand.
If you intend to pull the cooler onto the roof using a ladder
as a slide, then guide the cooler on the underside of the pan
(reservoir).
ILL1051-A
Содержание Breezair TBQI
Страница 1: ...INSTALLATION MANUAL TBQI Evaporative Cooler Original English Instructions ...
Страница 22: ...20 ...
Страница 23: ......