2
|
Step 20
FINAL CHECK
Complete the commissioning checklist at
the end of this document.
Step 14
INSTALL DRAIN VALVE
Never drain waste water directly onto the
roof. Be sure to use supplied ‘O’ Rings
and fittings.
Step 21
CLEAN UP
Clean up the site!
Page 17
Page 11
Page 17
Step 8
MOUNT THE COOLER
Lower the cooler onto the transition.
Step 9
CABLE INSTALLATION
Run the power and control cable down
the roof jack and out through the
grommet.
Step 15
LOCAL REGULATIONS
Read and adhere to local electrical and
plumbing rules and regulations.
Page 8
Page 12
Page 9
QUICK GUIDE
Step 1
SAFETY
Read & understand the safety section.
Step 19
COMMISSIONING THE COOLER
Switch the mains power on and test run
the cooler.
Step 2
COOLER LOCATION
Check cooler location. Consider
regulations. Discuss with customer.
Step 3
REMOVE VENTURI
Press the clip or remove the screws on
both sides of the venturi to release.
Step 7
CONVEY COOLER TO ROOF
Page 1
Page 4
Page 8
Page 15
Page 4
Always use 2 persons to position the
cooler when handling manually.
Step 13
INSTALL WATER SENSOR
Ensure the clip is fully engaged.
Page 11
Содержание Breezair TBQI
Страница 1: ...INSTALLATION MANUAL TBQI Evaporative Cooler Original English Instructions ...
Страница 22: ...20 ...
Страница 23: ......