![Seederman GS2 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/seederman/gs2/gs2_owners-manual-and-operating-manual_1232860011.webp)
11
Operating the Machine
Before beginning operation, complete the following checklist:
• The machine is in the OFF position.
• Seed is in the pan and the machine has been leveled.
• The correct sowing kit has been attached.
• The correct needles have been inserted to match the cells.
• The rails have been adjusted to the correct width for the tray.
• The indexing has been adjusted to the correct length.
• Air is connected to the machine.
The machine control panel is shown below, from left to right across the top
of the machine.
Figure 10. Vacuum
gauge.
Figure 11. Eject pressure
gauge.
Figure 9. Seed collector switch, needle cleaner switch and speed control.