10
Plug the signal cable (at least 2x 0.35 mm
2
Cu) into the O1A-01B
terminals of the GSM key and START terminals of your gate drive.
Use the power supply terminal last. The device will start working within about
one minute.
Now, the GSM Key is ready to be setup in administration.