TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
Secure turbine to turbine rail via rear of
fuselage. .
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I
would suggest you install a FOD. This
will save you money in the long run.
Install fuel pump close to UAT. We rec-
ommend to make use of a mechanical shut off valve as well.
Secure all Festo pipes with cable ties. Make sure fuel filter and gas canister are
mounted vertical.
Install Li Po or Li Fe battery in nose. I always put a fuse holder inline with power
cable.
No bypass is needed with bel mouth.
P-22
Assembly & Operation Manual
Photo 44
Photo 45
Photo 46
Photo 47