PrimeTest 350
Operating Instructions
- 79 -
Pressing the Left or Right arrows will open the list of
available test sequences
Press the index letter next to the require test sequence
name or use the
UP
/
DOWN
arrows to navigate through
the list. When the required test sequence is
highlighted, pressing
Select (F4)
or pressing the
LEFT
/
RIGHT
arrows will select the highlighted
sequence.
13.5 Frequency of inspection
The
Test Period
is the frequency, in months, of
inspection and testing of the equipment.
Note:
Suggested values can be found in the IEE
Code of Practise for In-Service Inspection
and Testing of Electrical Equipment.