background image

9.7.7

Lift one end of the defective fuse out of the fuse holder with the help of
a flat bladed screwdriver.

9.7.8

Lift the defective fuse completely out of the fuse holder.

9.7.9

Insert a new fuse as described and specified by the text on the battery
compartment cover.

9.7.10 Ensure that the new fuse is seated and centred in the fuse holder.

9.7.11 Relocate the battery cover over the battery compartment and fasten in 

position with the battery cover captive screw.

9.8

Calibration.

To maintain the specified accuracy of the measurement results, the instrument
must be recalibrated at regular intervals by either the manufacturer or an
authorised Seaward Service Agent. We recommend a recalibration period of
one year.

9.9

Spare Parts.

Fuse 31.75mm x 6.35mm 0.5A 600V Type F

Seaward Part No: 27B098

Fuse 20mm x 5mm 10A 250 V Type T

Seaward Part No: 27B106

Test Leads (with alligator clips)

Seaward Part No: 44B090

Carry Case

Seaward Part No: 71G082

PrimeTest 200

Operating Instructions

17

Содержание PrimeTest 200

Страница 1: ...PrimeTest 200 Operating Instructions Bracken Hill South West Industrial Estate Peterlee Co Durham SR8 2SW England Tel 44 0 191 586 3511 Fax 44 0 191 586 0227 www seaward co uk sales seaward co uk cal...

Страница 2: ...Operating Instructions Primetest 200 Operating Instructions Primetest 200 Operating Instructions Primetest 200 Fig 1 Fig 2 Fig 3 Fig 4...

Страница 3: ...Operating Instructions PrimeTest 200 Fig 5 Fig 6...

Страница 4: ...Operating Instructions PrimeTest 200 Fig 7 Fig 8...

Страница 5: ...Operating Instructions PrimeTest 200 Fig 9 Fig 10...

Страница 6: ...Operating Instructions PrimeTest 200 Fig 11...

Страница 7: ...Operating Instructions PrimeTest 200 Fig 12B Fig 12A...

Страница 8: ...PrimeTest 200 Operating Instructions...

Страница 9: ...opying recording or in any manner without prior written consent from SEAWARD Electronic Limited This also applies to accompanying drawings and diagrams Due to a policy of continuous development SEAWAR...

Страница 10: ...PrimeTest 200 Operating Instructions...

Страница 11: ...otes These operating instructions are intended for the use of adequately trained personnel The PrimeTest 200 has been designed to make measurements in a dry environment It must not be used for making...

Страница 12: ...ring function and insulation resistance measurement function M Electric shock danger Where safe operation of the tester is no longer possible it should be immediately shutdown and secured to prevent a...

Страница 13: ...n up to 200 M resistance measurement 10 Measuring function selects the voltage up to 250 V AC DC measurement 11 Measuring function C selects the temperature up to 400 C measurement 4 2 LCD and Keymat...

Страница 14: ...Test 200 is switched on from power off position to another switch position an on load battery test occurs The result of this test determines the available battery capacity A healthy battery results in...

Страница 15: ...infinity Bargraph accuracy 10 Test voltage 500VDC at 1mA 750VDC for o c Test voltage accuracy 20 0 Test current 2mA for s c Input protection 0 5A 600 V quick blow fuse An input voltage of 30 V AC DC...

Страница 16: ...current measurement Measuring Range Resolution Accuracy Overload Protection 3 5mA 0 01mA 10 2 digits 5 40 N A 15 2 digits 0 5 Test voltage mains supply 230V 15 10 10A max Frequency 50Hz 1 Test duratio...

Страница 17: ...ck test lead to exposed metalwork on the EUT 8 1 6 To start a Class I safety test sequence press the button 9 8 1 7 The earth continuity resistance for the EUT is measured at 200mA The large display 2...

Страница 18: ...the test is inhibited 8 2 5 To start the differential leakage test press the button 9 Mains power is applied to the EUT for a period of 2 seconds 8 2 6 Where a longer differential leakage test is req...

Страница 19: ...o the PrimeTest 200 then PE and PN symbols will flash and the test is inhibited 8 3 5 The earth loop resistance is checked and an ohmic range selected on the large digital display This resistance valu...

Страница 20: ...nt a high voltage is applied between the LIVE Neutral and common of the IEC lead 8 4 7 The insulation resistance of the lead is measured over a period of 2 seconds The large display 2 indicates digita...

Страница 21: ...or pushbutton action 8 6 Touch Leakage Current See figure 8 Attention before a touch leakage current test is performed on a Class II EUT the operator must ensure that the EUT has already passed a Cla...

Страница 22: ...display 3 will revert to indicating a PASS FAIL status An additional visual display of a or also indicates the PASS FAIL status 8 6 10 The touch leakage current will remain displayed until another ro...

Страница 23: ...h potential Electric shock danger 8 8 1 Ensure the circuit or test object to be measured is voltage free Ensure the IEC mains lead is disconnected from the PrimeTest 200 8 8 2 Select the insulation re...

Страница 24: ...ure 12a and 12b 8 10 1 Select the voltage measurement function on the rotary switch 10 8 10 2 Plug the voltage measurement adaptor into the IEC mains input plug 14 on the end of the PrimeTest 200 8 10...

Страница 25: ...aning 9 3 1 Clean the external case of the PrimeTest 200 with a clean dry cloth 9 3 2 Avoid using solvents and abrasive scouring agents to clean the external case of the PrimeTest 200 9 3 3 Check the...

Страница 26: ...be displayed 9 6 Checking the EUT Socket Fuses 9 6 1 Plug the PrimeTest 200 into the mains power socket using the IEC lead provided 9 6 2 Select one of the three power tests differential leakage curre...

Страница 27: ...ery compartment and fasten in position with the battery cover captive screw 9 8 Calibration To maintain the specified accuracy of the measurement results the instrument must be recalibrated at regular...

Страница 28: ...rence Positions 90 E1 N A Supply Voltage At the Limits Specified E2 0 52 by the Manufacturer Temperature 0 C and 35 C E3 1 Absorbed Current of Maximum Absorbed Current Device on Test of the Device on...

Страница 29: ...90 E1 N A Supply Voltage At the Limits Specified E2 0 53 by the Manufacturer Temperature 0 C and 35 C E3 1 Absorbed Current of Maximum Absorbed Current Device on Test of the Device on Test E4 N A Low...

Страница 30: ...ositions 90 E1 N A Supply Voltage At the Limits Specified E2 0 56 by the Manufacturer Temperature 0 C and 35 C E3 0 81 Absorbed Current of Maximum Absorbed Current Device on Test of the Device on Test...

Страница 31: ...ons 90 E1 N A Supply Voltage At the Limits Specified E2 0 75 by the Manufacturer Temperature 0 C and 35 C E3 1 4 Absorbed Current of Maximum Absorbed Current Device on Test of the Device on Test E4 N...

Страница 32: ...h Earth Open Circuit On Flash Flash Neutral Open Circuit Err 1 The PrimeTest 200 has failed one of the Earth Relay Pre Check tests Contact your local service agent Err 2 The PrimeTest 200 has failed o...

Страница 33: ...PrimeTest 200 Operating Instructions...

Страница 34: ...PrimeTest 200 Operating Instructions...

Отзывы: