Latest products and information available at www.sealite.com
6
SL-75
3–5NM+ Solar Marine Lantern
Charging the Battery
New lanterns should be left in the sun for 1-2 days to ensure battery is charged before placing
in service. Please note, lantern will re-charge even when toggle switch is turned to ‘OFF’
position.
Preferred Installation Location
For best lantern performance, ensure solar modules are not covered and are in clear view of the sky
with no shadows.
Manual Setting
The lantern can be programmed via 3 methods,
1. Bluetooth connectivity via the SealitePro
TM
App
2. Manually via the Switch settings
3. Via the optional IR Controller
If programming via the SealitePro
TM
App, please see the separate SealitePro
TM
Instruction Manual.
4
5
6 7
8 9 A
B
C
D
EF
01
23
4
5
6 7
8 9 A
B
C
D
EF
01
23
A
B
ON
OFF
Rotary
Switch A
Rotary
Switch B
Intensity Setting
ON / OFF
Switch
User
Replaceable
Battery
Lantern
Base
Installation
Manual Setting
Lantern is activated by ON/OFF Switch. Intensity and
fl
ash settings need to be set prior to activation.
1. Remove the marked
fl
ash adjustment bung from the base of the lantern and set internal toggle
switch to ‘ON’.
2. The power and range settings of the lantern are adjusted by setting the DIP switches inside the
lantern. Your lantern is normally set to maximum range (see
‘Selecting an Intensity/Power Setting’
section of this manual).
3. Set rotary switches to the required
fl
ash code (see
‘Selecting a Flash Code’
section of this
manual).
4. Replace
fl
ash adjustment bung.
5. A sealed vent on the base allows air transfer without moisture intake, and should not be disturbed.
6. To test place dark cover (towel or jacket) on top of lantern to activate sensor, lantern will come on.
7. Ensure that the unit is bolted to an even,
fl
at surface.