4.1
YK209F.V2 20TONNE PRESS ASSEMBLY (use the exploded diagram Fig.4 as a guide to assembly as well as the diagrams
below).
4.1.1. The bed frame is put in the bottom of the crate for transport, fix it to the uprights using bed frame pin (9) and circlip (10).
4.1.2. Attach the base section (1) and support pieces (3) to both the frame uprights, using bolt (2), washer (4), lock washer (5) and nut (6). Refer
to fig.1.
4.1.3. Move the pump assembly to the outside of the post, secure using bolt (37) and washer (4), which held the pump to the inside of the post
during transit. Refer to fig.2.
4.1.4. Fit the preassembled gauge assembly, consisting of gauge (33) o-ring (32) and gauge fitting (31). Ensure o-ring (23) goes between
gauge fitting (31) and banjo fitting (24) see fig.3. Twist the gauge as tight as possible to prevent it from leaking.
4.1.5. Fit handle (16) to the underplate (13) using washers (15) and screws (14).
Fig.1
Fig.2
Fig.3
4. ASSEMBLY
Original Language Version
YK209F.V2 Issue: 4(L) - 09/05/17
© Jack Sealey Limited