
7 - CONNECTIONS ON CN5
N
--------
--------
--------
--------
-
-
1
12
11
1
4
2
1
14
1
1
1
1
1
2
2
24
2
2
S
N
.1 S
I
ING
NNE
I N
It is possible to connect a switching device to change
the suppl voltage of control unit
If the main suppl is 115 60Hz, move the side switch
to 115 . The switching power suppl with voltages
ranging from 90 to 164 , eeps the output constant
on 30
Ca tion
for the connection to the power grid refer to
the regulations in force
o er S ppl Inp t
Power suppl connection input
ASE
N NEU RAL
G GR UND
N
G
GND PSOL BAT 28V
GND
N1
S LAR
ANEL
A
ERIES
12V
12V
S
N
GND
E SUN
UNI
2 1 11
charge 200mA
charge 360mA
charge 800mA
GND PSOL
28V
GND
N1
S
A
A
A
ERIES
12V
12V
GND
N
S
charge 200mA
charge 360mA
charge 800mA
E SUN
UNI
2 1 11 4
It is possible to power the control unit using
t o 12V
atteries connected in series 24V
1.2Ah min
,
connected, in turn, to the batter charger management
unit and this latter connected to the solar panel.
l ays se t e atteries c ar er nit to
connect t e atteries
Note
If ou use the E-SUN unit, ou must cut the cable
as shown in the figure and reconnect it on the CN5
connector, respecting the correspondences
S
A
ER
URREN mA
A
ER Ah
2
12 o 1
2
.2 A
ER
NNE
I N
I
A
ERIES
ARGER UNI
GNQ
taliano
ENGLIS
International registered trademark n. 804888
S LAR
ANEL
42
Содержание USER 2 24V DG R1B ALL-IN
Страница 38: ...Notes ...
Страница 39: ......