FASE 3
Motor M2 closes (from step 2), when the leaf reaches the closing mechanical stop press the button P1 (Fig.
6). Motor M1 will also start a closing cycle. When the leaf reaches the closing mechanical stop press again
the button P1 (Fig. 7).
3
The gate stops and motor M1 starts an opening cycle. Press agin P1 in the point where you desire to set the
leaf delay in opening.
When the leaf reaches the mechanical stop in opening press once again P1 (Fig. 8).
At this point motor M2 also will start an opening cycle.
When the leaf will reach the mechanical stop in opening push once again P1 (Fig. 9).
If the motos starts to open the gate, disconnect the power supply again, and reverse the motor phases.
Execute the same kind of connection on motor M1.
Repeat the programming procedurerogrammazione (fase 2).
Fig. 6
P1
P1
M2
M1
Fig. 7
M2
M1
Fig. 8
P1
P1
M2
M1
Fig. 9
M2
M1
SWING 2
32
WORKING TIMES SELFLEARNING
ON SWING GATE
English
Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
®
REV 07 - 05/2009
*