N.B.:
The operator comes as shown in Fig.1 (Closing on the right hand side).
Example:
Barrier with right hand closing (Fig.1)
Barrier with left hand closing (Fig. 2)
Before installing the spring check the choice of the barrier, if right or left hand side.
If the barrier is with closing on the left hand side move the connecting rod from the right to the left
hand side as shown in Fig.4 and 5.
N.B.:
Before executing this
operation
release the motor-reducer as shown in Fig.19.
Once exchanged the connecting rod tighten its fixation screw and lubricate with grease (Use DIN
51502 KP 2 N-20 - K 2 K-20 grease).
Tighten
at Max.50 Nm
Spring support
Spring tensioning
bolt
Fig. 3
Mi
39
.
n.
0.
in
Min.
.39 in
.
0
Fig. 6
Fig. 4
Fig. 5
Connecting rod
Connecting rod
SEA USA Inc.
10850 N.W. 21st unit 160 DORAL MIAMI
Florida (FL) 33172
Phone:++1-305.594.1151
Fax: ++1-305.594.7325
Toll Free: 800.689.4716
®
International registered trademark n. 2.777.971
Storm 24V
Rev. 00 - 11.2010
Code 67411125
6
Содержание STORM 24V
Страница 15: ......