2) Mounting of the spring
Insert the spring in to the carter as shown in Fig.7.
Fig. 7
Lubrication
with grease
during mounting
3) Mounting plate fixing
- Dig a hole 31.49x23.62x15.74 inches.
- Widen the foundation plate clamps at 60° (Fig. 8)
- Fill the hole with R425 concrete and place the foundation plate
as in Fig. 8.
- Level the plate with care.
* The plate has got a central hole for electric wiring so before
filling the hole with concrete put an elettric wire sheathing on the
hole.
Concrete
Fondation plate
to be levelled
Wire sheathing
Clamps 60°
~
Fig. 8
1
5
.7
4
31.49
SEA USA Inc.
10850 N.W. 21st unit 160 DORAL MIAMI
Florida (FL) 33172
Phone:++1-305.594.1151
Fax: ++1-305.594.7325
Toll Free: 800.689.4716
®
International registered trademark n. 2.777.971
Storm 24V
Rev. 00 - 11.2010
Code 67411125
7
Содержание STORM 24V
Страница 15: ......