19
The bracket must be positioned so that the operator is perfectly leveled.
NOTE:
If the brackets are installed before the operator, place the front bracket ½ inch lower than the
rear bracket (Fig. 26)
HT LARGE - FT LARGE
MINI TANK - HT - FT
Fig. 27
Fig. 28
2.75”
4”
½ in
Fig. 26
or
2.50”
1.81”
WELDING OF THE FRONT BRACKET TO THE GATE